• Further update to traffic congestion

    Tweet This

    Aug 19, 2010 at 5:17:37 PM by Joan Moore - Tags: - Comments (0)

    The Research Park office have been in touch with the subcontractor laying the high voltage cables around the Tesco roundabout and he advises us that he hopes to re-instate two lanes of traffic by 16.00 hours this evening.  This should relieve the congestion on the Research Park.

    He will not be working tomorrow and there should be a full flow of traffic around the roundabout.

    He will be working Saturday and Sunday, so we hope that works will be completed early next week.

     

Comments

No comments

Add comment

    • Heading 2
    • Heading 3
    • Center align
    • Right align
Insert new table








Uploading ...

or select an existing one

Filter:

Dimension (Height x Width): 0x0

Drag the slider around to scale image

 
 
 
 
 
 
 

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate eget, arcu. In enim justo, rhoncus ut, imperdiet a, venenatis vitae, justo. Nullam dictum felis eu pede mollis pretium. Integer tincidunt. Cras dapibus. Vivamus elementum semper nisi. Aenean vulputate eleifend tellus. Aenean leo ligula, porttitor eu, consequat vitae, eleifend ac, enim. Aliquam lorem ante, dapibus in, viverra quis, feugiat a, tellus. Phasellus viverra nulla ut metus varius laoreet. Quisque rutrum. Aenean imperdiet. Etiam ultricies nisi vel augue. Curabitur ullamcorper ultricies nisi. Nam eget dui.






Information about this web site

© The Surrey Research Park Office, Frederick Sanger Road, Guildford, Surrey, GU2 7EF, United Kingdom.
Telephone: +44 (0)1483 579693 | Fax: +44 (0)1483 568946 | Email: sales@surrey.ac.uk